Start with one shared brief

An approval process works best when reviewers are deciding against the same purpose. Before the first script, agree the primary audience, the action or understanding the film should support, the intended use and the boundaries of the content.

Then nominate one client coordinator to collect decisions. This role does not override HSE, engineering or legal authority. It ensures that the production team receives one coherent response and knows which specialist owns an unresolved point.

For a first project meeting, bring the brief, current source documents, the intended release date and a list of reviewers. A partially complete brief is workable when its open decisions are visible.

Give each reviewer a defined job

Invite comments from the people who can substantiate the content or approve its use. Ask them to review within their area of responsibility before the coordinator combines the response.

ReviewerWhat to checkDecision needed
HSE / technical authorityInstructions, terminology, visual accuracy, applicability of site informationAccept, correct or hold each technical point
Operations / site ownerAccess, equipment state, filming windows, restricted areas and contributor availabilityConfirm the proposed coverage is feasible within site controls
Corporate Communications / brandAudience, tone, identity, naming and consistency of the narrativeConfirm the message is appropriate for its audience
Legal / IR / disclosure owner, where relevantPermitted claims, confidentiality, attribution, release timing and rightsIdentify wording or assets requiring clearance
Project sponsor / final approverWhether the film meets the agreed purpose and authorised scopeApprove the defined milestone or return a consolidated decision

One person may hold several roles. Name the responsibilities rather than adding unnecessary approval layers.

Make the script easy to verify

Number the scenes. Place narration, on-screen text and visual direction beside each other. For technical claims or instructions, add the source document and revision in the working script. This makes it possible to check whether the complete scene carries the intended meaning.

A wording correction can have consequences beyond voice-over. It may change a subtitle, a graphic label, the shot selection or the sequence. Record those linked changes together.

Keep internal source references in the working document. The audience needs a clear film, not a view of the production team’s tracking system.

Resolve conflicting comments before sending the next instruction

Ask reviewers to identify the scene, the issue, the proposed correction and the reason. “Make it more exciting” is difficult to action. “Shorten the opening because the audience already knows the company; use the time to explain the new facility” gives the editor a decision to work with.

Classify comments as factual correction, required instruction, narrative preference, brand requirement or scope change. This helps the coordinator distinguish an essential correction from a creative preference.

If two authorised reviewers disagree about an instruction, record the conflict and return it to the responsible client authority. The production team should not choose a safety procedure or disclosure position to keep the edit moving.

Scene / timecodeCommentOwnerDisposition
Example: Scene 06Narration and graphic use different equipment namesTechnical reviewerConfirm approved term; update script, graphic and subtitle
Example: OpeningSponsor requests a new interviewClient coordinator / producerAssess scope, access and timing before authorising
Example: Scene 12Two departments propose conflicting instructionsDesignated client authorityHold this scene pending one approved instruction

Illustrative review log; these are not records from a named client project.

Approve in stages, with a clear basis for each decision

StageWhat is being approvedWhat it enables
Brief and messageAudience, purpose, scope and source basisA useful script and storyboard
Script and storyboardFacts, instructions, spoken wording, visual intent and provisional timingDetailed production preparation
Production readinessAccess, people, approved coverage, dependencies and site coordinationA shoot or animation plan that can proceed
Picture and language reviewSequence, visual accuracy, graphics, translations and subtitlesFinal refinement and recording as agreed
ReleaseThe exact exported versions, playback checks, usage and approval recordDistribution of the authorised files

The exact sequence depends on the assignment. For animation or footage-led work, some stages overlap. What matters is that the team knows what has been approved and what remains open. Approval of a storyboard does not grant site access or replace a permit.

Show the consequence of a late change before making it

When an approved element changes, describe what the request affects: script, recording, graphics, footage, languages, versions, delivery date or usage rights. Separate a correction within the agreed scope from an additional requirement.

For example, adding a location may require access coordination and another shoot. Changing approved narration after recording may require a talent booking and updates to every subtitle version. Explain the work and any cost or timing change before asking the client to authorise it.

A clear variation note protects the client’s control over the project. It should state the request, affected deliverables, proposed action, commercial consequence and the decision needed.

Close with an exact release list

Use a release register with the film title, audience, language, revision, filename, intended channel and named approval owner. Ask the approver to confirm the actual exported file, not just the script used to create it.

If a new master replaces an earlier version, identify which variants also need replacing. Keep the approved archive separate from the distribution folder. A file named “final” does not prove that it is the current authorised version.

Before you send the brief

  • We have one agreed audience and purpose.
  • The current source documents and their owners are identified.
  • Technical, brand and release responsibilities are assigned.
  • One person will consolidate comments.
  • The team knows what each milestone approves.
  • Languages, playback specifications and usage are part of the scope.
  • Late changes will be assessed before additional work begins.
  • The exact release files will receive a final check.